|
| Any process should ensure continuous improvement with experience to make efficient use of the system. At UnitedPro we have devised a similar Process model that is constantly revised to ensure the proper need of the client analyzed and the appropriate solution being developed and delivered. We have recently added the Tracking mechanism from the Requirement analysis and to the delivery level for attaining greater perfection in our development and delivery system. This has benefited our clients with reduced delivery time and their participation in the various stages of development. |
| |
|
- Integration of all modules and testing as per the approved methodology
- Release for Beta
- Get list of issues / bugs / change-request based on Beta release
- Scheduling for the final release
- Final release and proceed towards maintenance and sign-off phase
|
|
|
| |
|
- Incremental deliveries and module deliveries based on schedule
- Regular Communication with the client to update on project progress
- Schedule adherence and issues in previous releases
- Scheduling for the final release
- Re-scheduling if in case of any change request based on previous releases
|
|
|
| |
|
- Preparation of overall architecture and design specifics based on the requirement.
- Analyzing the design along with the client to match with the requirement
- Internal designs and development standards preparation
|
|
|
| |
|
- Constant interaction through telecom, mails and webex meetings.
- Documenting the exact requirement mechanism and testing methodologies.
- Finalizing the project tracking mechanism and testing methodologies.
|
|
|
| |